You are here: Home // Project Management Practice // Planning Effective Milestones For Web Projects

Planning Effective Milestones For Web Projects

Most successful internet design projects are organised into a program of milestones with each and every one representing a essential piece of the project. Milestones are easy in idea, but they can be tricky to nail down.

By way of example, how specific ought to we get with the milestones? If we get too certain, we risk breaking the project down into a chaotic mess of small chunks. Nevertheless, if we are not specific sufficient, the deliverables become unknown and absolutely nothing gets completed.

Discovering the correct balance is key. It takes practice and persistence, and it demands a lot of discipline from the designer or project manager. Milestones also vary from project to project. Larger projects require far more milestones even though smaller projects may only will need a handful.

In my expertise with several modest, mid-sized and huge projects, I’ve created a base list of milestones that I usually work with and adjust for my projects.

The first step would be to believe of a project in 3 big parts. The very first part is what I call “pre-heavy lifting.” Throughout this phase, the client needs to become acquainted to your project management style and systems, collateral must be collected and analysed, investigation should be conducted, and some initial wireframing and site mapping should begin.

The second phase is where the heavy lifting begins. Initial mock-ups will probably be designed and finalised, coding is completed, the content management program is setup, and an initial prototype of the internet site is furnished.

The final phase of the project cycle occurs following the heavy lifting has been completed. Making use of a final prototype of the site, you might want to conduct compatibility and error checking tests, and integrate any final client alter requests. The website ought to then be launch-ready and afterwards will need to be reviewed as soon as again.

Now that you simply have a clearer understanding of the three project phases, let’s take a closer look at the types of milestones that make it all take place.

The Pre-Heavy Lifting Phase Milestones

Do not design anything and do not code anything. As the first phase, you need to concentrate on obtaining to know your client along with the project at hand. Here are the typical milestones I use to maintain me on track.

  • Project Setup: The project has been setup in relevant systems (e.g. Basecamp, Harvest) and is ready for client interaction.
  • Client Onboarded: The client has been contacted about the project process and given access to the project management program (in my case, Basecamp). Sometimes I’ll have the client total a fast survey so that I can gather much more details about their vision.
  • Collateral Collected: All important marketing and advertising and creative collateral has been collected from the client. Collateral can consist of logos, graphics, brochures, literature along with other marketing and advertising copy.
  • Web site Map Total: An inventory of any existing content has been developed and also the web site map for the new web site finalised. Moreover, the client has reviewed and approved the site map.
  • Wireframes Approved: Wireframes have been completed for no less than the homepage and a single subpage, and the client has reviewed and approved them.

The Heavy Lifting Phase Milestones

This is my favourite portion of the project. When you have a firm grasp on the project along with a vision of its completion, it is possible to get to function.

  • Initial Mock-ups Developed: The first mock-ups for at the very least the homepage as well as a single subpage have been developed and shown to the client.
  • Final Mock-ups Produced: Based on client feedback, the mock-ups have been finalised and accepted.
  • Internet site Shells Developed: A site shell is what I call a static page that has been coded from the design. This is completed when all the HTML, CSS and JavaScript has been written and checked for errors.
  • Content Management System Setup: Server space has been partitioned and the CMS of choice (e.g. WordPress or ExpressionEngine) has been installed and configured.
  • Initial Prototype Developed: The site shells have been integrated with the CMS and all of the content pages have been setup.
  • Content Delivered: The content necessary for the site has been finalised and received from either the client or a copywriter, and is ready for insertion.
  • Final Prototype Accessible: A working prototype of the web internet site complete with content has been finalised and is ready for client review.

The Post-Heavy Lifting Phase Milestones

As soon as you reach this phase of the project, you are within the property stretch. All the difficult function is carried out and all that is left are finalisations and launch procedures.

  • Client Review Completed: The client has thoroughly reviewed the final prototype and has supplied you having a list of modifications to total before launch.
  • Client Changes Addressed: The adjustments provided by the client have either been addressed or completed to the client’s satisfaction.
  • Internet site Compatibility Confirmed: The prototype has been confirmed to work with all key browsers and operating systems. Any troubles have been fixed or resolved.
  • Pre-Launch Review Completed: A review for any lingering errors and difficulties has been done as well as the internet site has been cleared for launch.
  • Internet site Launched: All actions necessary to launch the internet site have been completed and it can be working properly on the domain name.
  • Post-Launch Review Completed: An extra review for errors and problems has been completed and any required fixes applied.
  • Client Training Conducted: Training essential for the client to effectively update their web site via the CMS has been completed.

Milestones are Just the Beginning

You can find two areas I didn’t cover in this post that I take into account crucial to a project’s success: timelines and to-do lists. As you hammer out solid milestones, they have to be reinforced with timelines that are realistic and doable. Numerous projects assign insanely short and impossible timeframes that only hamper the project and throw it into chaos. To-do lists may possibly seem somewhat elementary at initial, but they’re important for breaking down milestones into less complicated, much more workable chunks.

Milestones are dependent on both of these areas, which is why I’ll be dedicating future posts to cover them.

Inside the meantime, I’d be interested to hear about a few of the other milestone strategies on the market. How do you organise and manage your project milestones? Do you even use milestones? Leave a comment and let me know!